8/1/10 : Initial build started:


9/2/2010: Case fully insulated and liner installed; A/C units installed
in rear wall and 'ducting' fabricated to prevent 'hot air' to be expelled
from mixing with the necessary 'cool air' needed; drawer for humidifier
completed in base and base 'cavity' fully sealed.

9/7/10: solid Spanish Cedar 'uprights' installed to hand drawer glides
from yet allow for circular airflow

6/21/11

6/26/11


7,8,11
All drawers/doors have been 'sealed'

7.13.11 Shows Humidifier in its drawer and modified
upper drawers behind possible glass doors?


7/14/11


11,14,11: Crown Molding installed and upper drawers behind glass doors
re-designed
0

Now it gets dismantled for lacquering~~~~~~
12,3,2011 Lacquered and ready for
'rub down' and reassembly



12,11,2011: Cabinet
standing upright and getting reassembled
 
Humidifier:

12,22,2011: Needs
only Handles now!

|