11,27,2010: Veneer for sides of cabinet
Click to view Video
12,02,10 Cabinet 'shell' under construction

12,07,10 Face frame fabricated and installed on 'carcass'

12,14,10: Crown molding made and internal framing for drawer glide supports
completed

1,12,11: fully lined with rear panel in place; flutes and plinths fabricated
as discussed



1/16/11: Drawers almost completed



1/21/11 Barrister Door installed, drawer faces fitted and veneer bookmatched
for the 8 mid drawer faces

1/23/11: Applying veneer onto the 8 middle drawers to retain original
alignment
Assembly in vacuum press being laminated

Assemblage removed from vacuum press

Drawer faces all separated

Assembled Cabinet

Drawer face video
2/3/11: Initial 'test' of Humidifier [seals yet to be installed and glass yet
to be installed]

2/6/11 Mock-up of display shelf using cardboard

03.02,11 Display shelf made with slits to position retainers to hold display
boxes as desired:

3/4/11: views of Electronics and air flow design


3/9/11: views of Humidifier......+/- 1.5 gallon capacity

3/13/11: Custom made Mahogany Handles fitted onto drawers

3,21,11; Shows Cross Flow fans in each corner of the Cabinet and drawer
glides spaced away from the sides of the cabinet for air flow

3/22/11: Final Photos



|