4/18/10:
Cabinet fully insulated with 1.5" Rigid Foam and interior liner fitted; vertical
posts to support drawer glides positioned; opening for humidifier yet to be cut
into floor.

4/19/10:
Humidifier drawers installed and air ducts cut for humidifier air flow;
interior lining installed with insulation trimmed to fit


4/21/10 : AC insulation and rear panel fitted and ready for final
installation; drawers made


5/1/10: Ready for final sanding and lacquer.


5/4/10: lacquered and ready for reassembly and re-testing
\
